AYDIN-TURKEY / Kızıldere-3 165 MW Geothermal Power Plant ASV Project
ASV revision works are completed as EPC:
- ● Civil Works
- ● Equipment Erection
- ● Pipe prefabrication, site erection, testing and commissioning works
- ● Insulation Works
Start Date : 15.10.2018
Completion Date : 07.01.2019
Employer : ZORLU DOĞAL ELEKTRİK ÜRETİM A.Ş.
Administration : ZORLU ENDÜSTRİYEL VE ENERJİ TESİSLERİ İNŞAAT A.Ş.