AYDIN-TURKEY / Kızıldere-3 165 MW Geothermal Power Plant Project
For 165 MW geothermal power plant:
- ● Steam turbine and generator erection
- ● BOP equipment erection
- ● Pipe prefabrication, site erection, testing and commissioning of plant
- ● Insulation works
Start Date : 01.09.2016
Completion Date : 30.09.2017
Employer : ZORLU ENDÜSTRİYEL VE ENERJİ TESİSLERİ İNŞAAT A.Ş.
Administration : ZORLU ENDÜSTRİYEL VE ENERJİ TESİSLERİ İNŞAAT A.Ş.