MANİSA-TURKEY / Alaşehir 45 MW Geothermal Power Plant Project
For the 45 MW geothermal power plant:
- ● Steam turbine and generator erection
- ● BOP equipment erection
- ● Pipe prefabrication, site erection, testing and commissioning of plant
- ● Erection, testing and commissioning of production & injection pipelines
- ● Insulation works
Start Date : 23.09.2014
Completion Date : 18.09.2015
Employer : ZORLU ENDÜSTRİYEL VE ENERJİ TESİSLERİ İNŞAAT A.Ş.
Administration : ZORLU ENDÜSTRİYEL VE ENERJİ TESİSLERİ İNŞAAT A.Ş.