SUMGAIT-AZERBAIJAN / Azerikimya Steam to Power Project
he following works are caried out within the scope of the project
Material Supply:
Steel Structure Works:
Site Erection Works:
-
● Pipe prefabrication and site erection
-
● Air cooled condenser erection
-
● Installation of turbine, generator and other auxiliary equipments
-
● Installation of HVAC system
-
● Installation of fire figthing system
Start Date : 19.09.2019
Completion Date : On going -Planned Completion Date: 01.06.2020
Employer : PROKON LLC
Administration : SOCAR UNIPER